Weekly Production Log - Week 10
What
have we contributed this week:
This week I have been working on my Copyright worksheet that I started last week. I am finding a lot of sources which provide information and we was told to use a minimum of 20 sources because with information from one source it will not help us as it is not reliable unless we use a few other sources to verify the information we have gathered throughout the process of researching answers for the work sheet we are doing.
This week I have been working on my Copyright worksheet that I started last week. I am finding a lot of sources which provide information and we was told to use a minimum of 20 sources because with information from one source it will not help us as it is not reliable unless we use a few other sources to verify the information we have gathered throughout the process of researching answers for the work sheet we are doing.
How does this fit in with the production schedule of the project?
Currently I set to finish this work this week ready to be uploaded to Skydrive for Sunday this week which means I am on task and ready to finish this set piece of work.
Were there any problems that you faced?
There were no problems I faced this week because I just got on with the work and did not try to communicate with people in my class.
How did you overcome them?
There were no problems faced this week by myself as I was on track and not getting distracted by other members of the classroom.
Plans for the following week?
There are no plans for the following week as we have completed this Evaluation/Copyright Worksheet.
Saturday, 22 March 2014
Weekly Production Log - Week 9
What
have we contributed this week:
This week I have been working on my Copyright worksheet which would analyse our Music Video via the Copyright Rules. This including OFCOM Regulations. We were given a minimum limit of 3 Pages to do our write up with which meant I had to concentrate and not get distracted by other members of the Classroom. The write Up helped us see how our Music Video complied with the Copyright Law and how it either meets the watershed or does not meet the watershed.
This week I have been working on my Copyright worksheet which would analyse our Music Video via the Copyright Rules. This including OFCOM Regulations. We were given a minimum limit of 3 Pages to do our write up with which meant I had to concentrate and not get distracted by other members of the Classroom. The write Up helped us see how our Music Video complied with the Copyright Law and how it either meets the watershed or does not meet the watershed.
How does this fit in with the production schedule of the project?
There were no production schedule for this piece of work, but this is due on Sunday 30th of March in the following week which should be uploaded to our Blog Page to meet the required deadline.
Were there any problems that you faced?
There were no problems I faced this week because we had completed our Music Video and there was no filming or partner work to do throughout the week.
How did you overcome them?
There were no problems faced this week by myself because this was individual work and not to be completed with a partner.
Plans for the following week?
For next week I will be carrying on completing the work that was set this week and hopefully meeting the deadline for this piece of work.
Tuesday, 11 March 2014
Weekly Production Log - Week 8 (Deadline)
What
have we contributed this week:
This is our final week to get our editing done for our Music Video which then will be fully completed. We aim to get all the clips into the Program first and then edit by putting in effects and cutting the song to the beat. During our Lesson we had to ensure everything was tip top for our deadline day and we did. We completed the music video. We also spent after school hours to get the lip syncing right.
This is our final week to get our editing done for our Music Video which then will be fully completed. We aim to get all the clips into the Program first and then edit by putting in effects and cutting the song to the beat. During our Lesson we had to ensure everything was tip top for our deadline day and we did. We completed the music video. We also spent after school hours to get the lip syncing right.
How does this fit in with the production schedule of the project?
Again we are on track with the production schedule and we are not falling behind due to any issues but we have been re-filming shots that we are not impressed with which may make us fall behind but we are confident that we will not. Me and Kaval are making very good progress as we are ensuring that we turn up to any place where we have to re-film shots and we specify times which we can attend to which makes it easier for us to film and get shots done at a faster rate.
Were there any problems that you faced?
From our point of view there were no problems during the deadline week. Everything went smooth and there were no frustrations between us.
How did you overcome them?
There were no problems faced this week and we was proud of what we had achieved from this piece of work.
Plans for the following week?
For next week we need to start the evaluation of our work which will show copyright rules and work including OFCOM.
Saturday, 8 March 2014
Weekly Production Log - Week 7
What
have we contributed this week:
This week me and my partner Kaval have been editing the sequence of our Music Video which allowed us to keep track of time and be ahead of our schedule to edit. Throughout this week we got a rough idea of the whole sequence of our music video so we can show our teachers of how it could possibly look like after the final version was done. We received good feedback but we had to re-do a few shots which were not abiding the rule of thirds. This meant we had to go out and film the shots again after school. But as we have a draft of our work we did not need to worry about how the deadline as much as we would if it was to be done the following weeks.
This week me and my partner Kaval have been editing the sequence of our Music Video which allowed us to keep track of time and be ahead of our schedule to edit. Throughout this week we got a rough idea of the whole sequence of our music video so we can show our teachers of how it could possibly look like after the final version was done. We received good feedback but we had to re-do a few shots which were not abiding the rule of thirds. This meant we had to go out and film the shots again after school. But as we have a draft of our work we did not need to worry about how the deadline as much as we would if it was to be done the following weeks.
How does this fit in with the production schedule of the project?
Again we are on track with the production schedule and we are not falling behind due to any issues but we have been re-filming shots that we are not impressed with which may make us fall behind but we are confident that we will not. Me and Kaval are making very good progress as we are ensuring that we turn up to any place where we have to re-film shots and we specify times which we can attend to which makes it easier for us to film and get shots done at a faster rate.
Were there any problems that you faced?
There were minor problems such as frame fixing where we had to go out an re film certain shots in order for us to get the correct framing and not losing any marks. Other than that I think we have made very good progress.
How did you overcome them?
To overcome the scenes where the framing was not right we had to go out and re-film them in order to fix it. This did not take any time at all as the park was near to mine and Kaval’s house which meant that we can get the shots done in no time what so ever.
Plans for the following week?
For next week we plan in getting the whole music video prepared for finalisation for our deadline during the course of that week. Tuesday we will have a solid overview of the Music Video and Thursday during our deadline we will have a finished Music Video.
Saturday, 1 March 2014
Weekly Production Log - Week 6
What
have we contributed this week:
As we have got back from the Half Term Holidays we are on track and we expect to finish by the deadline with is in 2 weeks’ time. It is good to see that as a team I and Kaval are helping each other and looking over the shots we have done in order to improve them and how they look on the computer. We have completed the filming this week and we are almost in progression to the editing stage where I will be editing the music video to how I want it to look as It was my original idea. In this time we had after finishing all the shots we have been looking over other music videos to see what we can do during our editing stage and how we can implement some professionalism into the video itself.
How does this fit in with the production schedule of the project?
We are on track and we have not fell behind on any of the work so far so this means we are progressing onto finishing our music video itself and hopefully on the way to meet the deadline itself. We aimed to get most filming done last week and we have accomplished that which means we do not need to stress out because we have finished literally all of the filming itself.
Were there any problems that you faced?
There were a few problems that we faced which one of them was the scenes that we had filmed at the back of the park. The park scenes looked very professional but there was not movements what so ever which meant that the shots where still and they were boring. This meant we had to go and re-film it.
How did you overcome them?
To overcome the park scene situation we had to re-film it again with more movement which would actually help our music video flow and cut to the beat better. We also did the same shots it different angles and movement in order for us to get a mixture of angles and close-ups.
As we have got back from the Half Term Holidays we are on track and we expect to finish by the deadline with is in 2 weeks’ time. It is good to see that as a team I and Kaval are helping each other and looking over the shots we have done in order to improve them and how they look on the computer. We have completed the filming this week and we are almost in progression to the editing stage where I will be editing the music video to how I want it to look as It was my original idea. In this time we had after finishing all the shots we have been looking over other music videos to see what we can do during our editing stage and how we can implement some professionalism into the video itself.
How does this fit in with the production schedule of the project?
We are on track and we have not fell behind on any of the work so far so this means we are progressing onto finishing our music video itself and hopefully on the way to meet the deadline itself. We aimed to get most filming done last week and we have accomplished that which means we do not need to stress out because we have finished literally all of the filming itself.
Were there any problems that you faced?
There were a few problems that we faced which one of them was the scenes that we had filmed at the back of the park. The park scenes looked very professional but there was not movements what so ever which meant that the shots where still and they were boring. This meant we had to go and re-film it.
How did you overcome them?
To overcome the park scene situation we had to re-film it again with more movement which would actually help our music video flow and cut to the beat better. We also did the same shots it different angles and movement in order for us to get a mixture of angles and close-ups.
Plans for the following week?
For next week we plan in getting started on the actual editing of our footage on Final Cut Express which means we are still on track to meet our deadline in two weeks’ time. Also I will allow Kaval to try some editing out as well which lets him have a chance in contributing in our editing process for the Music Video itself.